Home Deliverables

DELIVERABLES

Del. no.

Deliverable name

WP no.

Lead beneficiary

Dissemination
level


Delivery date from Annex I (proj month)

D1.1

Users-case Description

1

EMPA

PU

6

D1.2

Overall description of used methodologies and end-user experience

1

DPC

PU

9

D2.1 v.1.0.1

“System Architecture” document - first release

2

TERN

PP

18

D2.2 "System Architecture" document - final release 2 TERN PP 24
D3.1 Software package for implementation ISTIMES system – first release 3 ED PP 24
D3.2 Software package documentation – first release 3 ED pp 24
D3.3 Software package for implementation ISTIMES system - final release 3 ED PP 30
D3.4 Software package documentation - final release 3 ED PP 30

D4.1

Intermediate analysis of the experimental and theoretical aspects underlying the state-of-the-art application of the proposed EM technologies for the global vision of the infrastructure (SAR, Hyperspectral sensors, Fiber Optics)

4

TERN

PP

12

D4.2

Intermediate analysis of the experimental and theoretical aspects underlying the state-of-the-art application of the proposed EM technologies for the local vision of the infrastructure (ERT, GPR, GBSAR, Camera, Infrared Termography)

4

TERN

PP

12

D4.3

Sensing techniques integration and correlation

4

TEL

PP

12

D4.4 Controlled experiments carried out to compare the skills of the different EM technologies at two test sites 4 LCPC PP 21
D4.5 Complete analysis of the experimental and theoretical aspects underlyng the state of the art application of the proposed integratedem technologies for the infrastructure monitoring 4 IFSTTAR PP 24

D5.1

Description of the structure […] on the highway bridge

5

EMPA

PP

15

D5.2

Description of the structure […] on the railway tunnel

5

TERN

PP

15

D5.3

Installation phase of the ground-based sensors for the highway bridge

5

EMPA

PP

18

D5.4

Installation phase of the ground-based sensors for the railway tunnel

5

TERN

PP

18

D5.5

Algorithms to be used for (near real-time) monitoring of the highway bridge

5

TERN

PP

18

D5.6

Algorithms to be used for (near real-time) monitoring of the railway tunnel

5

TERN

PP

18

D5.7 Diagnostic results for the highway bridge during the monitoring period 5 EMPA PP 27
D5.8 Diagnostic results for the railway tunnel during the monitoring period 5 TERN PP 27
D5.9 System Integration, report 5 TERN PU 33
D5.10 Critical analysis of the effectiveness of the ISTIMES proposal in the two test cases 5 DPC PU 36

D6.1

Contacts database

6

EMPA

PU

6

D6.2

Web site updating and maintenance program

6

TERN

PU

6

D6.3

Dissemination plan

6

TERN

PU

9

D6.4

Interim dissemination report listing all activities with measures of success

6

TERN

PP

18

D6.5

Exploitation plan

6

DPC

PU

18

D6.5 V. 2 Exploitation plan 6 DPC PU 36
D6.6 Final dissemination report listing all activities with measures of success 6 DPC PU 36

D7.1

Project Handbook, comprehensive of a Quality Management Plan

7

TERN

PU

3

D7.2

Detailed implementation plan

7

TERN

PU

6

D7.3

Project final report, with gender issues report appended

7 TERN PU 36

D7.4.1

Half-yearly Reports to be collated at the end of each quarter

7

TERN

PU

3

D7.4.2

Half-yearly Reports to be collated at the end of each quarter

7

TERN

PU

6

D7.4.3

Half-yearly Reports to be collated at the end of each quarter

7

TERN

PU

9

D7.4.4

Half-yearly Reports to be collated at the end of each quarter

7

TERN

PU

12

D7.4.5

Half-yearly Reports to be collated at the end of each quarter

7

TERN

PU

15

D7.4.6

Half-yearly Reports to be collated at the end of each quarter

7

TERN

PU

18

D7.4.7 Half-yearly Reports to be collated at the end of each quarter 7 TERN PU 21
D7.4.8 Half-yearly Reports to be collated at the end of each quarter 7 TERN PU 24
D7.4.9 Half-yearly Reports to be collater at the end of each quarter 7 TERN PU 27
D7.4.10 Half-yearly Reports to be collated at the end of each quarter 7 TERN PU 30
D7.4.11 Half-yearly Reports to be collated at the end of each quarter 7 TERN PU 33
D7.4.12 Half-yearly Reports to be collated at the end of each quarter 7 TERN PU 36

D7.5.1

Annual Reports to be produced annually on the anniversary of the project start date

7

TERN

PU

12

D7 5.2

Annual Reports to be produced annually on the anniversary of the project start date

7

TERN

PU

24

D7.5.3

Annual Reports to be produced annually on the anniversary of the project start date.

7 TERN PU 36

 

 


PU = Public

PP = Restricted to other programme participants (including the Commission Services)

 

Calendar
May 2013
S M T W T F S
28 29 30 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31 1
Events
No events
We have 4 guests online